BCL_Header

St George's Music Hall, Bristol

 

Summary:

Extension to existing Music Hall

 

Sector:

Commercial

 

Services:

Foundations, substructure and external works

 

Client:

St George’s Music Hall

 

Main Contractor:

Midas

 

Start Date:

2016

 

Location:

Charlotte Street, Bristol

 

Value:

£360,000

Scope of our works: BCL completed enabling works which led to main groundworks package including reinforced foundations and ground floors slabs as well as temporary works such as propping to the in situ piled wall that enabled the structure to be built. Access has proven to be difficult and we have used a 20t long reach excavator.

Midas_Logo