BCL_Header

Dyson, Malmesbury

 

Summary:

Construction of a new community hub and student accomodation for Dyson Institute of Engineering Technology

 

Sector:

Commercial

 

Services:

Groundworks, forming bund, foundations, drainage, services, external works

 

Client:

Dyson

 

Main Contractor:

Beard Construction

 

Start Date:

January 2018

 

Location:

Malmesbury, Wiltshire

 

Value:

£1,400,000

Scope of our works: After careful material management and remediation of existing material to minimise import, we are now progressing with forming the earthwork retaining structure through the site including the natural granite stone walling. Reinforced foundations for the bespoke accommodation pods and drainage including attenuation tanks have now commenced and we shall be following on with the services and external works such as paving, kerbs, edgings, resin bound surfacing, tree pits and site furniture. A permeable footpath will run along the top of the structure as per the artist’s impression. Associated foundations and upstands for the structural steel frame to the two-story community hub building have been completed and will require the construction of a lift shaft and ground floor slab with detailed waterproofing. The external works have been undertaken in a restricted environment due to a large greater crested newt habitat area within the boundary of the site.

Beard_Logo